ICU Rooms Boom System Replacement & Integration
Regional Acute Care Medical Facility
Deliverables
ICU Decommissioning
Boom System Installation
Patient Lift Reinstallation
Data Cabling Termination
Electrical Reconnection
Medical Gas Integration
Medical Gas Certification
Operational Readiness Support
Hendrix Medical completed a targeted ICU rooms infrastructure upgrade for a Midland-based medical facility. The project included the removal of outdated equipment and installation of a new ceiling-mounted boom system, while preserving and reinstalling existing patient lifts to maximize cost efficiency.
How Strategic ICU Modernization Improves Reliability, Safety, and Throughput
This engagement focused on targeted infrastructure replacement in an active surgical environment where downtime and room turnaround directly affect patient scheduling and care continuity. Hendrix Medical developed a sequenced execution plan to safely retire aging boom assemblies and preserve selected assets with remaining lifecycle value.
By reinstalling existing patient lifts while upgrading boom infrastructure, the project achieved a balanced capital strategy: modernized core workflow systems without unnecessary replacement spend. Our team coordinated data, electrical, and medical gas reconnections through disciplined validation checkpoints to reduce commissioning risk.
Final certification confirmed code-compliant gas performance and safe clinical operation. The completed environment now supports improved equipment reach, cleaner cable management, and more predictable perioperative workflow.
Decommissioning & Removal
Back-pulled existing data cabling across the affected ICU rooms.
Disconnected all electrical feeds and medical gas drops tied to retired equipment.
Demolished and removed legacy booms and patient lift assemblies.
Properly disposed of all decommissioned equipment.
Installation & Integration
Installed and aligned the new ceiling-mounted boom system.
Reinstalled existing patient lifts to maintain cost efficiency.
Re-pulled, terminated, and tested all data cabling pathways.
Reconnected electrical circuits and medical gas services for full functionality.
Compliance & Certification
Completed full medical gas certification and validation testing.
Project Impact
The upgrade modernized the facility's ICU infrastructure while maintaining operational efficiency and compliance standards. The new boom system enhances clinical workflow, improves equipment positioning flexibility, and ensures safe, certified medical gas integration.